How long does installation typically take?

The installation itself typically takes 1-3 days, but there are various steps and different parties involved that go into powering your home with solar.

Rest assured, we work to make the process go as fast as possible. On average, customers can expect it to take a total of 3-6 months from signing the contract to the system powering their home. This timeline is typical for the solar industry due to increased demand for home solar, and at times it can take longer than 6 months.

Along with a site assessment of your home to get a custom design, there are additional permitting and approval steps with the city and utility. Click here to learn more about the installation timeline.